building inspection

Wisma Zelan Management Corporation

To All Valued Owners/Tenants

Reference is made to the above.

Kindly be informed that under Fire Service (fire certificate) Regulations 2001, the building owner must obtain bla bla bla bla......

In this respect, there will be a building inspection by Jabatab Bomba on 26 October 2009 (Monday) from 10:00 a.m. onwards and the following will be carried out :-

1. Inspection on all fire-fighting equipment and system. (so mafan >.<)
2. Live test of Fire Alarm Bell. (must be very noisy O.o)
3. Temporary power supply disruption. (yeah,no need work liao ^.^ )
4. Temporary lift system disruption.....

WWWHHHHAAAATTTTT?!?!?!?!




you want the whole LLTC staff to run from 18th floor to the lobby?!?!?!